• Functional test maximum thermostat

    In accordance with SCIOS information sheet 2 (version 1.4: 2020-10), the maximum thermostat must be functionally tested for switching value when performing PO, PI & EBI.

    Extending to the switching value is not justified in every installation. In these cases an alternative test method is necessary.

    Read more: Functional...

  • SCIOS – PO – PI – EBI

    NC Engineering B.V. has the expertise and certification for Maintenance - PO, Periodically Inspection – PI, First Basic Inspection for – EBI, Advise and Guidance on a new projects with regard to EN standards.

    Basically, every new burner installation and fuel supply line, will need the EBI, within 6 weeks of commissioning.

    Read more: SCIOS – PO –...

NC Engineering is committed to the environment. For example, our technicians have been at the basis of the development of the Low NOx gas burner, which significantly reduces harmful gas emissions, and the development of the flue gas condenser. In the future we will continue to commit ourselves to developing sustainable solutions in the field of combustion technology.

Service-oriented, reliable and fast. That's what NC Engineering stands for!